CDM 2007 client
For information about the duties of the client under the 2015 CDM regulations see CDM 2015 client.
The text below relates to the superseded 2007 CDM regulations and is provided as a historical reference.
The Construction (Design and Management) Regulations (CDM Regulations) are intended to ensure that health and safety issues are properly considered during a project’s development so that the risk of harm to those who have to build, use and maintain structures is reduced.
They were introduced in 1994 and came into force on 31 March 1995 following publication of European Directive 92/57/EEC on minimum safety and health standards for temporary or mobile construction sites. They were substantially revised in 2007.
The regulations impose duties on:
- The client.
- Designers.
- The CDM co-ordinator.
- The principal contractor.
- Contractors.
- Workers.
The duties of the client include:
- Taking reasonable steps to make sure arrangements for managing the project by duty holders are suitable to ensure:
- Construction work can be carried out so far as is reasonably practicable without risk to the health and safety.
- Suitable welfare facilities are provided for any person carrying out the construction work.
- Any structure designed for use as a workplace has been designed taking into account the Workplace (Health, Safety and Welfare) Regulations 1992 (the design of, and materials used in, the structure).
- Promptly providing pre-construction information to every person designing the structure and every contractor who has been or may be appointed by the client.
Where projects are notifiable under the regulations (projects which last more than 30 days or involve more than 500 person-days of construction work), the clients must also:
- Appoint a CDM co-ordinator.
- Appoint a principal contractor.
- Ensure construction work does not start unless a construction phase plan is in place.
- Ensure construction work does not start unless there are adequate welfare facilities on site.
- Provide information relating to the health and safety file to the CDM co-ordinator.
- Retain and provide access to the health and safety file.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- CDM
- CDM 2015
- CDM co-ordinator.
- CDM for self-builders and domestic clients.
- CDM regulations duties of clients.
- CDM regulations duties of contractors.
- CDM regulations duties of designers.
- CDM regulations duties of workers.
- Construction phase plan.
- Domestic client.
- Health and safety file.
- Notify HSE.
- Pre construction information.
- Principal contractor.
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.